Practical Training Report on Basic Networking and Microsoft Windows Server

Introduction to Basic Networking and Microsoft Windows Server Project:

Basic networking is a concept which is based on the internet and also in the use of computer technology too. It is also based on the local development which is one of the main parts of the networking concept. In this basic networking user accomplish many authoritative terms by which they can work in a proper way. Here each and every single provides us the information about the authoritative power and the authentication modes.

Basically networks are the accumulation of each single personal computer by a part of networking devices. These accumulations later then work as the abundant networks. These networks are then connected to the computers by a device called as HUB which normally hosts the servers. Internet work has a concept called as Router which is used to join the server networks together to share the data from one computer to another. Packet switching, packet filtering, communication and path choice are the functions that a router can perform.

Another topic is the Topology which is the updates which are made to the material layout of the systems. There are various types of topology and some of them are Single node topology which is always joined with the servers, Bu8s topology which is joined to a common tabled which is named as trunk. Ring topology is which where all networks and devices are associated in a closed loop. Star topology is which every single device is associated with the HUB. Mesh topology is which every device is associated to the other devices.

Networks play an important role in this concepts and LAN, VAN, VPN San are the various types of networks. Layered approach is the part of OSI model which contains application layer, presentation layer, session layer, transport layer, network layer, data link layer and physical layer are the sub types of reference layers. There are various other topics that are related to the basic networking which is written in detail in various reference books.

Download  Practical Training Report on Basic Networking and Microsoft Windows Server .

Airline Reservation System BCA Project Report

Introduction to Airline Reservation System BCA Project:

The title of the project is “Airline Reservation”. It is used to do reservation in flights through online by using internet. Previously, the existing system is done by manually and not generated immediate and updated results. I.e., if any person wants to do reservation, he/she have to travel certain distance and does the work manually before 2weeks. So they waste their time and money and even not get immediate results. If any information is missing, they can’t get reservation. It is very lengthy process and not secure. So we should provide a new technique. In which these mistakes are not done by us and not to waste anything.

                         Airline reservation system has two parts, which are exercise reservation platform (ERP) and management platform. ERP faces only passengers. To avoid these types of shortcuts we provided a new software, which is not only user interface but also show the details of flights and time schedule all related information. It fulfills the passenger’s desire. Depending on the problem we have to study the feasibility study is nothing but testing the utility of feasibility and meet the user need and effective use of resources and checks the working ability of our propose system.

                         Feasibility study is 3-types, which are Technical feasibility (TF), Economic feasibility (EF) and Operational feasibility (OF). TF is used for both software and hardware existing computer system. These technical resources are sufficient for our system and determines whether. EF is used for economic position not to weigh budget. Consider only s/w and h/w, development and implementation. OF is used for according to user need we have to operate that way. h/w requirements are RAM-64MB, Hard disk and processer. s/w requirements are Microsoft visual basic6.0, MS Access2000, OS windows 98SE.

                          Advantage of this system has online electronic post office. So data is encrypted and performance is accuracy, high-effective, reservation and cancellation enquiry. Future enhancement is our system more reliable, reservation and cancellation enquiry, flight status, all these will be done through online by adding large-scale SQL server, advanced VISUAL BASIV and passengers will ask airline time  and enquiry. 

Download  Airline Reservation System BCA Project Report.

Project Report on Image Gallery

Introduction to Image Gallery Project:

The Image Gallery application software allows the user or visitor to access the two different categories or sections known as “Read” and “Write”. The “Read” tab grants the user to see the images in the album, to give a comment for the particular image, see images by slide show. The “Write” tab allows the user to access and post the images of them or uploading of images. 

The holder owner of the Gallery has a registered user account and possesses special accessible rights. The owner does not have the rights to control or regulate the “Owner” and the “Primary Group”. They are only rights to access their “Read” and “Write” access permissions. The “Owner” and the “Primary group” permission rights is made only for the Administrator. 

The Existing system 

The existing system focused on the data analysis that are extracted from the different records. The system tackles the decisions and transactions on the basis of the data collected. To collect data the commonly used tools are the Flow charts, Interviews, Training, and the Experience also some general knowledge. These tools are combined to form a system. The shortcomings of the system is to understand the problem after only completely defined and investigated and need the solution. 

The Proposed System 

The Proposed system has image gallery of our interest to create it. The merits of the system are:

  1. The user friendly Interface
  2. Quick access to the database
  3. Reduce error
  4. More Storage 

The Proposed system is developed on the Windows XP/SP2 operating system, Java Run time Environment 1.5, ASP for the front end program, Microsoft Access 2003 for the Back end program. The hardware specifications are Intel Pentium IV 2.4 GHz, 256 MB RAM, 40 GB hard disk.

A Spy Based Approach for Intrusion Detection Project Report

Introduction to A Spy Based Approach for Intrusion Detection Project:

The current intrusion detection system (IDS) is able to protect the only host or bunch of the interlinked systems that are networked. The single host IDS is known as the Host- based intrusion detection system. The network host IDS is known as the Network- based intrusion detection system.

The both intrusion detection system has some defaults, like, the host based IDS has demerit of the inability of the detection to the new kinds of the threats in the system, whereas the Network based IDS is cumbersome to handle, which is not able to identify the encrypted packets of data. The Network based IDS creates the time consuming transfer of the log information and that causes the huge collection of the data and resulting in traffic. This concludes with the incorrect performance of the system. 

The Proposed Spy Based IDS has the merit over two IDS by combining the both single host and Network IDS enhancing the efficiency and creates the information transfer with no problem. 

Anomaly Intrusion Detection 

This kind of Intrusion Detection System keeps the information regarding the use of the system and prepares the statistical data for it. This checks the unusual action which can be intrusions. 

Misuse Intrusion Detection 

The IDS can identify the only know intrusion type. This is not able to detect the new type of Intrusion. 

Features of the Spy Based Intrusion Detection System 

  1. Regulator of the system
  2. Honeypots
  3. Possesses network sensor
  4. Spy type
  5. Log
  6. Tracer

Credit Card Fraud Detection Using Hidden Markov Model .Net Project Report

Introduction to Credit Card Fraud Detection Using Hidden Markov Model .Net Project:

The usage of the Credit Card has been tremendously increased. The fraudulent also increased simultaneously with the Credit Card usage. The Credit Card is used for the online payments and also for the normal purchases.

The Project is based on the model the detection of the frauds during the Credit Card usage by applying Hidden Markov Model (HMM). The principle is to make the HMM known to the Credit Card and the act of the Card holder. The fraud is considered when the HMM does not allow the Credit Card transactions. 

The Existing System 

In an existing system the fraud can not be detected. Fraud is identified after the Credit Card holder complains about the fraudulent. The investigation also takes lot of time to complete. The huge data and information is required for detection of the fraud for all transactions which are maintained in the log. The way of using the Credit Card is difficult. To detect the fraud first the requirement is to get the IP address. 

The Proposed System 

The Proposed System is based on the immediate behavior of the Credit Card holders. It does not require the fraud signatures. The Credit Card transaction is done in a stochastic procedure. 

The general fraud detection system is not able to detect separate transactions. The HMM overcome this problem by detecting the False transactions. 

The hardware system required is Pentium IV 2.4 GHz, 40 GB, hard disk. 256 MB RAM. 

 Download  Credit Card Fraud Detection Using Hidden Markov Model .Net Project Report .

E-Banking System Project Report

Introduction to E-Banking System Project:

The application software known as I- Connect is made for the popular Regional Bank inSouth India. This bank also has many branches in major cities and towns in the North. For past 3 years, almost all banks are become computerized to offer its customers the process of e- banking. The bank has been very close to its customers after implementing of e- banking which also enhanced the basic operational strategy. The Banks are focused to start I- Connect which is basically a IT enabled service. The I- Connect concept is only applicable for the saving account customers, not for the Current account holders. The current facility related to the I- Concept is to provide a customer to view the account. The application only prefers to perform transactions for chequebook requistiton, fund transfers from the personal accounts. 

The I- Connect is designed in a distributed architecture which has centralized storage system for the database. The storage of the data in the application I- Connect uses the MS- SQL Server 2000. The interface is designed by applying ASP.Net Technologies. The SQL Connection method is applied for the database connectivity. The application can be used without any threat, and the proper protection mechanism has been monitored continuously. 

The work of the I- Connect is to assist the administrative staff to develop the different modules and the combined reports with the proper strategy and standards. 

The Existing System is time taking, producing errors, taking manpower and lacking the data security. The current system also takes more time to retrieve the data with less accuracy and more time to prepare a report. 

The Proposed System includes-

  1. Produce immediate reports
  2. Exact and effective estimations
  3. Information in brief
  4. Security of data
  5. Easy and better keeping of records
  6. Transactions is easy and accessible

 Download  E-Banking System Project Report  .

Distributed System Project Abstract

The aim of this Project is to assist students to create the distributed applications with the help of RMI – Java program. 

The Project deals with the management of the occasion cars at the Dealer showroom  by Client- Server application. The application must have option for the registration of the new cars and its sales receipt. This information or data is next transferred to the Server by implementing the Car and Receipt objects. The Server has to produce every new information into the text file or the database which is stored in the system, can be read. The information regarding the car is made for the Client to look car on the basis of its number. This request is then transferred to the Server which backs the information to the Client. 

The Server consists of the use of the Hahmap, Hashset, Vector, Hashtable class. 

The work to develop a program can be done by the Console but JFrame can also develop it.

 Download  Distributed System Project Abstract .

HRMS Employee Performance Management Project Abstract

Introduction to HRMS Employee Performance Management Project:

The SAGA INC., a medium scale Pharmaceutical company was started in 1999 and in that time it was the only branch. Now the company has grown upto the strength of 200 employees and has two more branches or units in other states. 

The Current System 

The SAGA Inc. HR department is very efficient in recruiting the people and providing the deserving remuneration for their employees. Now the company strength has more with more that one branches, so the HR department is also maintaining the centralized or common database system to retrieve the information of their employees. The HR Online system is made for both the HR and employees to update and get the information. 

The HR department is still maintaining the employee performance report in the manually documented style. The cumbersome works leads to delay of deserving employees to get reward and appraisal along with the difficulty of identifying the past performance of the staff. 

The appraisal procedure gets more delay when the file of the employee evaluation shifts from one desk of manager to next high official desk. 

The Proposed System 

The Proposed system is known as the Employee Performance Management System to maintain the records in an automatic generated form. The system has following features. 

  1. The two kinds of evaluation of an employee can be done by the official.
  • The Annual Performance evaluation which directly related to the recommendations for the wages increment.
  • The evaluation of the allotted project and its status and also the next project. 
  1. The HR, Management, Supervisor, Staff can use the system for accessing the tasks to be done and performance evaluation.
  2. The HR evaluates the employee record as following.
  • HR needs information of the employee and supervisor of the current project and similarly the previous project to evaluate the performance of an employee and authorize the supervisor.
  • HR prepares a evaluation form which has to be responded by an employee about his or her goals achieved.
  • The HR then gives this form to the manager to evaluate and provide the appraisal for promotions.

 Download  HRMS Employee Performance Management Project Abstract .

HRMS Time and Expense System Project Abstract

Introduction to HRMS Time and Expense System Project:

The Project Time and Expense System is made for the employees for the organization to update their work hours and expenses in the internet based Application software regarding the time and expenses during the job from any place for 24 hours. The system software keeps the data of time and expenses spent by an employee in various works, start ups, implementation of project and others. The system perfectly reports and presents the information data in different types, so that the supervisor can estimate the time and expenses. The employee can construct the other data like the expenses in, locality, projects, project related time and expense in a extraordinary style to make it more understanding to the manager. 

Current System 

The existing system of the Time & Expenses is manually done and the should be well documented for the future use. The work is also cumbersome. 

Proposed System 

The Proposed system is focused on the time and expenses of the employee regarding their focused work and initiatives to communicate with the clients. The system also allows you to supervise efficiently the problems and the estimated budget on the project to overrule the hurdles. The manager can also look into the weekly and regular Time report and review it on combined authorization system. 

The Features of the Proposed System 

  1. The Time & Expense system can be explored from any where on the internet for both employee and the manager.
  2. The Time has option to add comments in it. The review can be done on weekly or daily.
  3. The employee has the option to make template that is useful for filling timesheets.
  4. The inbuilt approval system for the Time & Expense enables the manager to approve and disapprove the information provided by the employee. The project initiatives are prepared for the daily or weekly approval.
  5. The comment can be given to each approval and disapproval system and can effectively manage team.
  6. The approval system allows to the manager to make Time & Expenses system a multiple manager approval system with first and second stage of approvals.
  7. The past timesheet can be copied with the help of single option.
  8. The easy and immediate accessibility of the Timesheet for the complete financial year.
  9. The inbuilt administration module systematically supervises and generates the default features of the application.
  10. The Management part of the administration module makes easy and immediate access to managers.

Download  HRMS Time and Expense System Project Abstract .

HRMS Leave and Attendance System Project Abstract

Introduction to HRMS Leave and Attendance System Project:

The application of HRMS Leave and Attendance system is to record the attendance and the Leave data of the employees. The check in and check out of the employees at the time of entry and exit had been recorded every day. The work of the system is to sum the present days and the absent days of an employee for the use of payroll department. The special attendance like the leave applications and the other leaves are being summarized specifically.  The  system has  divided the leave application  into the Casual leaves, Privileged leave and the sick leave giving to access the HR to make payroll easily. The option for the employees to check their leaves and attendance online is also available. 

The Existing System 

Currently the employee has to sign in an register which is there in the front office during in time and the out time. The cumbersome work is there for the HR department to make a sheet of attendance and leave for each employee at the last of the month. This is very time consuming and error proned. 

The Proposed System 

We Proposed a new system. This consists of two modules.

  1. Employee
  2. Administration or HR 

Employee Module consists of: 

  1. Log in Log out.
  2. Paid off or Compensatory off.
  3. Leave Applications. 

Above offs and Leaves has to be approved by the head by seeing the Leave balance and Monthly attendance report. 

Administration Module 

The module has operations related to the administrative functions and made for the HR department. The module consists of: 

  1. Leave Eligibility: HR prepares the Leave eligibility for the different types of Leaves at start of the year. The criteria’s are made on the yearly basis along with the previous years balance.
  2. Monthly attendance: The monthly attendance of an employee is made by the HR.
  3. Daily absent report: The Administration can check the daily absent record for the each employee. The every month history record can be generated and evaluated.   

Download  HRMS Leave and Attendance System Project Abstract .