Java Project for BCA Final Year on Airlines Reservations System with Project Report

Introduction to Airlines Reservations System with Project:

The Airlines Reservations System (ARS) was started to modify the system for convenience of the passengers and to be very effective. The Airlines Reservations System is actually a computerized reservation system by which the reservation of the seat can be done online. The Computerized Reservations System is explored as global distribution system for all airlines and displays the information of availability to other distribution channels and travel agencies for getting a reservation through the one system. 

The information provided to the passengers are the Airline Schedule, the Fares, Reservations, Ticket details. The Airlines Reservation System works for itself and also for the Global Distribution System. The passengers have opportunity to access the Reservation system online to reserve  the ticket. 

The System consists of five modules. 

  1. Administrative module: The module is made for the doing tasks related to administrative functions and handle inventories on the internet. The module can be managed by the administrator to modify the information related with routes, fares, time of departure and arrival, can allow and assign the access for the users.
  2. Reservation agent module: The module is made for the agent who can make and do modification the reservation information on the internet. The agent office can be situated at any location.
  3. Passenger module: The module is made for the passengers who can directly book the reservation and send requests.
  4. Payment: The module is made for the travel agents and agencies to offer the discounted fares for the passenger.
  5. Cancellation: The module is made for the user to cancel the ticket.

Download  Java Project for BCA Final Year on Airlines Reservations System with Project Report.

Java Projects for MCA Final Year on Library Management System

Introduction to Library Management System Project:

The Library Management System is the digital assistant of the Librarian to handle the Academic Library in the University. The System possesses all important modules to edit and update the registered members and books. The System has module to specify the Client’s statement or requirement.

The System comprises of the perfect management information system or MIS which is developed for the purpose of maintaining and creating of the back end and front end development features. The back end supports the data to be constant and integrated along with the secured data and maintained library. The front end supports the application to be working and easy to handle.

The Existing System

The Existing System has to be identified for the existed problem and their relationships. Something need to manage the problem. The problem sorting out has begun of system analysis of different operations done by the program.

For starting of problem identification the data had made identified from different files, also the decision equations and the transactions managed by the system.  The successfully identification of the problem can be done by the complete evaluation and analysis of the problem to get solution. The perfect analysis model must have the way of problem identification and structure for the solution. The solution leads complete extraction of the data. The proposed system has to be perfectly evaluated on the basis of requirements.

The Proposed System

The Proposed System consists of the computerized Library Management System that has modules for  add, search, update, edit and transactions entry related with the information of books. The Proposed System has many benefits.

  1. User oriented display
  2. Easy access of Database
  3. Error less
  4. Huge Storage abilty
  5. Easy search option
  6. User understanding environment
  7. Easy Transaction

The Proposed System has ability to ease the manual Library System to maintain and manage with Computerization. 

Download  Java Projects for MCA Final Year on Library Management System.

Visual Basic Porject Idea on Railway Ticket Scheme System

Introduction to Railway Ticket Scheme System Project:

The goal of RTS scheme is to outline programming to thoroughly robotize the course of action of concerning a track ticket.

  1. To make a database of the entourages
  2. To receive the user qualified information and give a PNR number.
  3. To compute passage
  4. To improve a trip organizer

TEAM STRUCTURE

Main target is attempting to execute popularity based model of venture administration and execution. That is every last trace of the arranging, outline and coding steps of venture are finished in path of interest by every last trace of the group parts.

MODULES IN DETAIL

It is part one and this embodies accompanying sub undertakings:-

  1. examining for accessibility
  2. Accepting portions
  3. Journey organizer
  4. Checking for accessibility

This incorporates taking after ladder:-

a)                  meeting traveler portions

b)                  giving out the permit solicit

c)                  computation of passage

d)                 concerning the PNR

e)                  concerning ticket portions

Journey organizer

It is an inventive thought we are recommending. Programmings above all else prerequisite are that it might as well reduce or dispose of manual effort. It might as well as user well disposed would be prudent.

Notwithstanding what we suggest to actualize by it is, by actually dropping in the beginning and completion location, we will find the post of emulating parts

  1. Direct develops to the end of the line
  2. Connection develops which are achievable

Ticket wiping out:

It is the errand of scratching off a line ticket. You are crossing out advances to the adjustment of the record holding the dispensed traveler’s parts. There are several cases:-

a)         Termination of an affirmed ticket includes changing RAC-1 to drop ticket and touching every last trace of the RAC plus Waiting catalogue sections up by single.

b)         Termination of RAC includes moving the following RAC and holding up post sections up by single.

c)         Termination of a coming up post unequivocally includes the climbing by one every last trace of the following Waiting catalogue passages.

Download  Visual Basic Porject Idea on Railway Ticket Scheme System.

CSE Project Topic on Railway Crew Management System

Indian Railway, the planet’s most substantial grid (under a specific administration), comprises of other than 100,000 Drivers/Assistant/Guards, which shapes the fundamental working crew, answerable for Train actions.

Expectation From Propose System Project

The framework gives the organizer best adaptability to develop greatly proficient team calling squares bringing about upgraded group usage dependent upon all countrywide and ensemble lawful prerequisites. This can make relating decreases in labor and prices. The explanation modeler used for the CMS result is ecological inviting and it is composed in quite a technique to the CMS utilizes the TFT & slender customer mechanics which recoveries parcel of force for every group booking areas over the customary PC’s plus CRT screens based framework.

CMS is completely reconciled; it administers finish generally speaking daily regulatory and operational power of the sum team assets all through Rail track system. Rapidly distinguishes more group assets to meet unexpected scenarios. Accessibility, necessity of arrangement and any limitations are posted as per User-outlined governs. Programmed distinguishes unlawful or unqualified groups as per pre-characterized User rail system. Mechanically produces team agenda.

CMS database keeps every last trace of the fundamental qualified data concerning every group part incorporating: essential information for example name, location, sex, people, date of life commencement and telephone numbers, private aptitudes for example dialect articulating and master aptitudes for example the sorts of team and mentors’ qualifications finish record of advertisements-updates of grade, Keep a evidence of all preparing in use and the times when they should be replenished.

To split the repetitiveness of group while holding up for their spin at the group booking anteroom a test has been furnished. QUICK infers question for civilizing team Knowledge. It is a team learning assessment and enhancement Game. Quickly recognizes more bunch stakes to meet unforeseen situations. Receptiveness, indispensable item of presentation and any impediments are presented according to User-laid out oversees.

Download  CSE Project Topic on Railway Crew Management System.

DFD ER Class Diagram for Airline Booking System Project

Algorithm

In this stage facilitate I had composed contrivances for diverse specialized sub situations a few than are encased here with.

Reservation

  • An individual comes to save a ticket. 
  • Then he gives his full portions 
  • In client shape the aforementioned parts were composed. 
  • Then workstation check the date what date the individual held 
  • Date keen it check the flights 
  • If the flight is excursion that day 
  • Then framework support the particular flight id 
  • It checks its seat class. 
  • If the traveler prefer to budgetary class and window side seat 
  • Then framework check if there any seat in budgetary class which is within the window 
  • If seat is purge then framework held the seat. 
  • Then ticket is created. 
  • The ticket is affirmed. 
  • If the condition is not connected then it check subsequently seat and supported it. 
  • If it’s not additionally discharge then it checks subsequently by afterward. 
  • if there is no seat then framework take ticket which is not affirmed 
  • Then it gives holding up post. 
  • Lastly it gives a post and finishes the framework.

Cancellation

•           A traveler comes to drop the ticket

•           Then the framework opens the erase structure

•           Then click shoe summon.

•           It showcase every last trace of the traveler record

•           Then select the PNR number and click erase choice

•           The framework demonstrates record is erased.

Flight_ Details:-

In flight portions we first make a structure. Then we make all message boxes. We make charge box. in this structure we are utilize diverse charge box the aforementioned are past, in the first place, subsequently, include, brand new, overhaul, erase, recovery in this shape we include unique flight record and overhaul it then the Value is heading off to the database. When we click subsequently, final, past, first summon bind Then it demonstrate different thing serially. An individual comes to know the timings for the flight which is run over from Delhi to Goa. Then we click demonstrate order catch.

Concession

•           First it clicks the concession box.

•           Concession box open

•           It chooses the classification.

•           Then its compute.

•           And the admission is computed.

•           Then irrevocable passage is producing in ticket.

Download  DFD ER Class Diagram for Airline Booking System Project .

Airways System Visual Basic Project with Documentation

Introduction to Airways System Visual Basic Project:

With the progression of time and technology every organization has to come up with some innovative ideas in order to catch the notice of audience. So there is a need for brand promotion and for successful brand promotion every organization requires logo.

The logo should be distinct and displays the nature of business. Nowadays people have to travel to every corner of the globe for business, for study and other purpose so they prefer to travel by air. If one takes the route by air then it takes less time than any other transportation system and destination seems to be close. 

In the 21st century the aircraft management is really on the brink of gaining recognition. The system should be designed with the advanced technology so that it can make the transportation simple. But the software of the aircraft system is fast enough to access the airport maintenance and passenger details in a single database so that if required it can be accessed without wasting much time. The airport management system is generally known as visual basic. The system is quite flexible and structured. It has included some low level features that are based on structured programming language.                  

 The system is widely available and used in various systems like main frames or PC. It is independent and can be ported from one system to another system.

The interface is use-friendly and contains some option list, scroll bars and text boxes. On this system it is quite simple to work on if any individual has little knowledge about the programming language. Consequently design tasks can be used for several hours but it can be easily carried out in few minutes. In this programming language you can easily design the elements of the language in any programming project later on.

Download  Airways System Visual Basic Project with Documentation.

Research on Indian Network Infrastructure Project Proposal

Course: MSc Data Networks and Security

 

AIM: To investigate the present technology and infrastructure of various computer network firms and analyse how the infrastructure is coping up with the present trends with regards to sustainability and improvement of the IT Sector in India.

 

PROJECT PHILOSOPHY:

MOTIVATION BEHIND CHOOSING THE TOPIC: CRUX BEHIND THE PROJECT

Networking significance is one of the major criteria’s for this study. It is the primary concern of a researcher to understand the present technology and retain an insight of its future scope. It is always beneficiary to have an up to date knowledge about the technologies to stay ahead of the targets and sustain in the competitive industry. A good foundation results in a strong establishment of the technology involved. Many articles and surveys revealed that Indian firms will top the IT sector in the world in next two decades. This project will act as an eye opener dealing with the future infrastructures adopted by companies in India to compete and excel and retain themselves as strong competitors with the other companies of the world. 

OBJECTIVES

      To study and compare the current computer network infrastructure in well established and developing software industries. 

      To conduct a research on various security technologies adopted in the Indian companies. 

      To analyse the reliability of infrastructures adopted in both types of firms. 

      To underline the problems and drawbacks faced in general and try to provide adoptable and relevant solutions. 

      To highlight factors that control cost effectiveness and reliability. 

METHODOLOGY:

The Methodology adopted will be qualitative including interviews with Indian IT companies as the main resource of findings backed up with the Literature review.

The prime aim is to develop a blue print on how to conduct the research on the present infrastructure of the companies and then try to analyse the glimpse of the future perspective.

Preparing a questionnaire and getting feedbacks from people of related sectors.

Divide the tasks in stages to help achieve better results. 

      Primarily, the interviews will help to find relevant points regarding technology improvement and detail out strategies of the companies to become and remain successful. This will help in comparing the systems of both developed and established companies with the developing companies.

      Secondarily, read the research articles on the IT companies and develop a blue print on the infrastructure they house. Prepare a list of companies on which the research would be done

           This will be entirely based on books, journals and articles in the internet which will                     provide information related to previous studies relevant to this topic and thereby can help in finding practical solutions for the improvement of the use of technology in an efficient manner.Collecting and implementing the acquired information in the required areas and to analyse the results keeping the business point of view in mind.

The research also includes the information regarding the newly established IT firms in or nearer rural areas. In this scenario, relevant information regarding the foundations and frame works of the companies are noted and analysed whether they match to the level of established MNC’s and if not what are the factors that are influencing for these firms to stay behind the competition. 

Glimpse of the future

The IT companies have started recognising the importance of infrastructure and developing  in order to meet the upcoming technologies. Major firms like WIPRO, INFOSYS, IBM, COGNIZANT etc  give more preference to the infrastructures. This trend is likely to be followed by all the companies and thus India is destined to be the future IT capital of the world.

Implement and Design a Sigma – Delta based ADC for GSM Receiver

MSc Mobile Communications 

Research Dissertation Proposal Form 

Discuss briefly the scope of the research: 

In recent years , the bandwidth for wireless  communication standards keeps on increasing from 1st  generation 1G which is first introduced in 1980’s and had only 200khz signal  bandwidth  to wireless local  area network(WLAN)  and worldwide interoperability microwave access  ( WIMAX)  in recent years , which has 20 MHz  signal bandwidth . Increasing the signal bandwidth allows for faster data transmitting and receiving rate. Meanwhile, it also increases the difficulty of designing the Analogue to Digital converters inside a transceiver.

                 As in this research we Implement and design a sigma – delta based analogue to digital converter for GSM receiver. Sigma – Delta ADC architecture has been preferred for wireless receivers in handheld devices 

Comment on how you might evaluate your own the research goals:  

        We compare the performances of first order      ∑  ∆  modulator, second order ∑  ∆  and third order ∑  ∆  modulators  . When multiple first-order ∑  ∆ loops are cascaded to obtain higher order modulators, the signal that is passed to the successive loop is the error term from the current loop. There will be some error difference between the integrator output and the quantization output. Essentially, the noise shaping function in a ∑  ∆  modulator is the inverse of the transfer function of the filter in the forward path of the modulator.

Concise outline of the Research Methodology you plan to use: 

1)    Design a sigma – delta analogue to digital converter 

2)  Design a GSM receiver 

3)  Simulation and results in two ways           

  • plot for single sine wave
  • plot for GSM  signal

Discuss briefly any equipment you might require, or any data sets with which to commence expedition of the research project: 

I will design the circuits in matlab and execute them in matlab itself, so there is no need of any other equipment 

What knowledge and skills do you have that will be most relevant here? 

We need good skills of Matlab and we should have a thorough knowledge on digital signal processing and communication systems  

Schedule for plan of research and estimated hours: 

  • Understanding on  working principle of Nyquist rate ,oversampling and ∑  ∆ ADC’s 
  • Study of ∑  ∆ ADC in terms of  Bandwidth , Dynamic range oversampling ratio 
  • ∑  ∆ ADC modulators and it advantages 
  • Study and design a GSM receiver and quantify its Dynamic range requires  for the ∑  ∆ ADC 
  • Developing a design of the proposed ∑  ∆ ADC 
  • Simulation and Results 

Payroll Management System MS Access Project Database Tables

  • Department Master
  • Leave Register
  • Employee Master
  • Pay Slip
  • Staff Appointment Master
  • Staff Relive Master 

Table Name: Department 

Field Name Data Type Constrains Description
Dcode Text P/K Department Code
Dname Text NOT NULL Department Name

 Table Name: Employee 

Field Name Data Type Constrains Description
Ecode Text P/K Employee Code
Ename Text NOT NULL Employee Name
Dname Text NOT NULL Department Name
Shift Number NOT NULL Shift
Salaryday Number NOT NULL Salaryday
Apno Number NOT NULL Appoinment Number
Esiper Number NOT NULL Esi Percentage
Pfper Number NOT NULL Pf Percentage
Esino Text NOT NULL Esi Number
Pfno Text NOT NULL Pf Number

 Table Name: Leave Register 

Field Name Data Type Constrains Description
Ecode Text NOT NULL Employee Code
Ename Text NOT NULL Employee  Name
Monthyear Text NOT NULL Month Year
Flag Text NOT NULL Flag
Nod Number NOT NULL No Of Days                  
         

 Table Name: Pay slip

Field Name Data Type Constrains Description
Ecode Text R/K Employee Code
Ename Text NOT NULL Employee Name
Sdate Date/Time NOT NULL Salarydate
Myear Number NOT NULL Month Year
Sday Number NOT NULL Salary Day
Noofday Number NOT NULL No Of Day
Pay Number NOT NULL Pay
Esino Text NOT NULL Esi Number
Pfno Text NOT NULL Pf Number
Pfper Number NOT NULL Pf Percentage
Esiper Number NOT NULL Esi Percentage
Pfamt Number NOT NULL Pf Amount
Hramt Number NOT NULL Hra Amount
Daamt Number NOT NULL Da Amount
Taamt Number NOT NULL  Travel Amount
Oaamt1 Number NOT NULL  Other Amount 1
Oaamt2 Number NOT NULL Other Amount 2
Totalsal Number NOT NULL Total Salary
Canteen Number NOT NULL Canteen
Sadvance Number NOT NULL Salary Advance
Netpay Number NOT NULL Net Pay
         

 Table Name: Staff Appointment 

Field Name Data Type Constrains Description
Apno Number P/K Appoinment Number
Apdate Date/Time NOT NULL Appoinment Date
Name Text NOT NULL Name
Sex Text NOT NULL Sex
Dob Date/Time NOT NULL Date Of Birth
Addr Text NOT NULL Address
Quality Text NOT NULL Quality
Salary Text NOT NULL Salary
Fname Text NOT NULL Father Name
Martialst Text NOT NULL Marital Status
Appas Text NOT NULL Appointed As
Std Text NOT NULL Standard
Prevexp Text NOT NULL Previous Experience
         

 Table Name: Relive 

Field Name Data Type Constrains Description
Relno Number P/K Releive Number
Apno Number R/K Appoinment Number
Ename Text NOT NULL Employee Name
Reason Text NOT NULL Reason

Payroll Management System VB and MS Access Project

In this phase the existing system has been studied, the problem is identified, the alternative solutions are analyzed and the best solution has been selected after the feasibility analysis. 

In this step the following steps are carried out: 

                                      1. Existing System

                                      2. Proposed System

                                      3. Comparative System 

              The need for the system stems from the nature of the organization.  In order to justify and appreciate the need for the system, we have to study the existing system.  By conducting the system study, we are able to find out what are the goals specified, whether all the objectives are satisfier, what are the disadvantages of the existing system etc. Here the existing system is maintained manually.  So to computerize this, we must bind the system by identifying the scope of the function and performance that are desired.

                The existing system is maintained manually. In the present system whenever the customer gives an order it is maintained manually in the notebook. Manually they have to update the production order, production plan of items, production monitoring etc.  So the present system is not good enough for the company.

      The disadvantage of the existing system is

  • File maintenance is extremely difficult as every thing is done manually.
  • Information retrieval is difficult and time consuming.
  • Quick analysis of delivery is not possible.
  • Not enough security and privacy.
  • Requires much human effort.
  • Information need not be accurate. 

          The proposed “Payroll Management System” is developed to systematically maintain the employee details and their Appointment Details and their Payroll calculations. This system reduces the Manual File Maintenance and easy to view the details about the particular employee details. This system reduces the manual calculation for employee pay slip. 

Comparative Systems Study

While Comparing the Existing system and proposed system, proposed system is best due to the following reasons 

  • Speed of process increases.
  • After performing a long period human becomes tired, but computer works for a long time continuously (Diligence).
  • Accuracy is more.
  • Deleting, Copying, Updating is possible.
  • Processing Time will be decreased.
  • More Security. 
  • Backup is available.

Salient Features of the system

Hardware Specification

Processor Type          Pentium II

Ram                             128 Megabytes

Clock speed                 866 MHz

Hard disk                    20 Gigabytes

Floppy disk                 1.44 Megabytes

Mouse                         Logitech

Monitor                       Hcl

Keyboard                    Hcl (101 Keys)

Printer                         Epson FX_100 

Software Specification

 Front end                         Visual basic 6.0

Back end                         Ms-Access 7.0 

Operating System            Windows 98