Distributed Cache Updating For the Dynamic Source Routing Protocol Java Project Report

Introduction to Distributed Cache Updating For the Dynamic Source Routing Protocol Java Project:

The main objective of this technique is to find the broken links which are transferring information and to divert them to the other nodes which are present in the cache. A cache update algorithm is used for updating the new cache structure called a cache table for the broken links. In this paper we will see for the cache algorithms are implanted for find the broken links and updating the caches.

Brief into the working of the distributed cache updating:

To make cache update for the broken links each node maintains the cache table information required for making the cache updates. When a link failure is detected the algorithm notifies all the reachable nodes which have the cached link. The proactive cache updating includes some protocols for patching up the broken links.

We have two types of routing protocols available for the adhoc networks. The proactive protocols maintain a up to date information of the nodes which periodically disseminates the topology updates through the network. Whereas the on demand protocols make the discovery of the routes only when the routes are required.

Limitations of existing system and advantages of distributed cache updating:

In the existing system the link failure occurs in the mac layer as it undergoes multiple transmissions due to increase of stale route packet delivery latency. The stale route packets remain in the caches only due to the usage of FIFO replacement algorithm.

By using proactive cache updating the propagation of stale routes to other routes gets prevented. A new cache updating algorithm is used which makes the dynamic source routing to adapt quickly to the changes occurred in the topology.

Download  Distributed Cache Updating For the Dynamic Source Routing Protocol Java Project Report.

Discovering Conditional Functional Dependencies Java Project

Introduction to Discovering Conditional Functional Dependencies Java Project:

The main objective of this paper is to give idea of conditional functional dependencies. As usage of computers is increasing are day to day, the storage of data also is more. The data has to  be cleaned an removed if it is not useful.

Data cleaning should be done automatically by finding out the errors. Hence this gave rise to conditional functional dependencies. CFDs are considered as a extension of functional dependencies. CFD supports patterns of  related constants, and hence it can be used as rules for cleaning relational data. 

For discovering CFD three methods are used . First, CFD Miner is used to discover CFDs whish have constant patterns. These constant CFDs are important for identifying an object to clean .The two algorithms which are used for discovering general CFDs is CTANE and FastCFD, CTANE is considered as extension of TANE which is used  in mining of FDs. 

FastCFD is based on the depth-first approach and it reduces the search space. When the relation is large, CTANE is said to work well. FastCFD works better than CTANE in terms of arity, when the arity of the relation is large. Using CFDMiner is faster than CTANE and FastCFD. These algorithms used for cleaning are based on type of application by the user.

Download  Discovering Conditional Functional Dependencies Java Project.

Administration and Inventory Process System Project DFD Diagrams

Introduction to Administration and Inventory Process System Project:

In every business organization the details of production and the supply are maintained by using an application. In this paper we will see how the application maintains the administration and the inventory system details. By giving the request for the sales or the production details it checks from the administrator database and processes the request. In this the application runs the ERP sales between the supplier, administrator and the consumer. In this paper we will be looking into production purchase and billing system, supplier registration and validation system, customer edit details and supplier edit details.

Brief on the data flow models:

An administrative system is present which maintains the details of the raw materials supplied from the supplier and also maintains the details of the goods supplied to the customers. Here the inventory system maintains the details of the checks issued to the supplier and the payments received from the customer and also maintains a production account for maintaining the details of the finished goods.

The production system also checks the availability of the goods for generation of the bills and it maintains a finance database for maintain the billing processes. A billing system is present where the user can look into his account by entering his user id and password and can check the bills by sending a request to the administrator.

Conclusions:

It is very difficult for the persons to look after huge databases and generate responses for the requests. So this kind of administrative systems are very useful for maintaining the databases and they give fast responses for they given requests.

 Download  Administration and Inventory Process System Project DFD Diagrams.

Seminar Report on Demand Based Bluetooth Scheduling

Introduction to Seminar Topic on Demand Based Bluetooth Scheduling:

The main objective of this paper is to give idea of Bluetooth scheduling.  As the wireless communication is advancing day to day, blue tooth technology has been developed. Bluetooth is defined as a wireless communication technology between devices which are Bluetooth enabled. The communication through this Bluetooth device is  possible within a range of 10m. Each cluster of blue tooth device is called as piconet.

Brief into Demand Base Bluetooth Scheduling

Generally, this Bluetooth technology operates in ISM band. Bluetooth employs Time Division Duplex for communication between devices. Since this band is so noisy, to reduce noise frequency hopping is used. Each piconet consists of one master and up to 7 slaves in which each master and slave communicate by using TDD slots. 

Piconet is identified by the Master Bluetooth Address and clock. If the blue tooth participates in two piconets then a bridge formed between them and this is called a scatter nets. Demand based Bluetooth scheduling is achieved by fixing the polling positions of synchronous and shared slaves. The polling period is updated based on the traffic of the master or slave. The simulation of Demand-based scheduling is done by considering only ADS slaves. 

Advantages and Disadvantage:

The Demand-based Bluetooth scheduling increases the throughput of the piconet and reduces the power consumption of the piconet. This scheduling increases the access latency of the slaves. If the access latency of the slaves increases, this may lead to losing a packet.

 Download  Seminar Report on Demand Based Bluetooth Scheduling.

Demand Response Scheduling By Stochastic SCUC Project Abstract

Introduction to Demand Response Scheduling By Stochastic SCUC Project:

Many independent system operators have designed programs to utilize the services provided by the demand response. Demand responses are provides with the demand response providers which manages the customer responses. In this we will look into a stochastic model which utilizes the reserves provided by the demand response in the markets.

Brief on Demand response scheduling:

We find two types of demand response programs they are time based demand response programs and incentive based demand response programs. Time based demand response programs are designed for independent system operators which contain the programs like time of use tariffs, critical peak pricing and real time pricing.

Whereas the incentive based programs have a market based structure and can be offered in both retail and whole sale markets. Most of the incentive base programs have its own goal of operation and san over long term, midterm and short term. A stochastic mixed integer programming model is suggested in which the first stage involves a network constrained unit and the second stage involves security system scenarios.

Advantages and Drawbacks in the existing system:

The demand response providers participate in the electricity markets which act as a medium between the retail consumers and independent system operators. The demand response programs offer aggregate response in the independent system operators. Many independent system operators have the requirement of minimum curtailment level but the demand response programs are lagging this. The demand response programs don’t provide security to the system.

 Download  Demand Response Scheduling By Stochastic SCUC Project Abstract.

Data Leakage Detection Project Abstract

Introduction to Data Leakage Detection Project :

In this paper we will see how data how data leakage occurs and the preventive measures to reduce the data leakage. Data leakages occur when the sensitive are handed over to the trusted third parties and due to this leakage occurs and the data may be found at the unauthorized persons. Perturbation is the most effective technique use for reducing data leakages. In this paper we will look into the unobtrusive techniques for detecting the data leakages.

Leakage prevention techniques:

Perturbation is the effective technique in which the data to be handed over is modified and made less sensitive so that the leakage does not occur. Water marking method is traditionally used in which a unique code is embedded in the data so as to identify the data leakage.

This model is used for accessing the guilt of agents and algorithm is used for distributed the objects to the agents. We will use agent guilt model analysis which estimates the values in the objects for guessing the targets. By using the component failures are known and by using this it checks the location of the leaked agent. To check the parameters interaction with the scenarios generated guilt model analysis is used.

Conclusions:

When there is need for the data to be handover to the other agents then we can use the watermark technique for the data, for finding the leakages. If there are more intended users there it will be difficult for us to know from which agent the data leakage has occurred by using watermark technique. The proposed algorithm employs various data distribution strategies for finding the leaker which ensures safety for the distributer.

 

Bank Management System Project Report in VB

Introduction to Bank Management System Project:

In the present scenarios, banks play a significant role in handling the wealth of an organization. The term globalization had completely changed the banking industry and numerous banks are being established in various countries. This is because of the increase in banking customers, number of transactions, etc.

Now-a-days, most of the transactions have become electronic and enables their customers to made transactions via internet without going to a bank. So, today successful banks are maintaining their customer databases which are running into millions. However, due to recent recession the industry growth had slowed down. So banking industry came under study with the introduced regulations in order to clearly analyze its activities. In order to ensure its profitability, most of the banks imposed self regulations on lending and other activities.

Now the economies are slightly increasing its standard and allowing the banks to again improving their financial growth. In banking industry, in spite of consolidation still there are numerous people struggling for both attention and subsequent transaction of its consumers. These days, banking industry are feeling burden because of its business and competitive pressures. Among the competition, there are some aggressive player’s like Telco’s where it offers private label credit cards, micro-payment options, etc.

Regardless of present pressures, banks don’t have enough money to slow down. So, the bankers are considering customer bases as priority and taking help from loyalty programs to fulfil this task. Further, banks are restoring the data collection processes of customers for investigation through intelligent analysis. Because of the large number of partners, bankers are mainly selected coalition loyalty programs. Most of the products or systems are becoming complex.

So the implementation of any new product in present market refers to an realization, application, and execution of a model. Moreover, the maintenance phase in a software enables the user to correct the defects which occurs while field usage. 

Download  Bank Management System Project Report in VB .

Hospital Management System Project Documentation

Introduction to Hospital Management System Project:

Before designing any application it is very important to study the market this is also applicable if the application is already designed and when that needs to be modified. For the proposed system it is important to apply your ideas and also consider the existing system.

The present Hospital Management System is designed based on the customer reviews and ideas as this has to fit for both large and even to small size hospitals around the world.

Based on the requirement the features and modules must be built and this application is accepted in worldwide hospitals and the management is satisfied with the application.

The complete website is built on the 3 tier architecture by using the latest technologies the designing part is more user-friendly attractive. The database of this application is more expandable and this application is more customization for the clients.

The market research makes the application to be more user-friendly and the functionalists help to complete the work easily.

This application records everything right from the registration of the patient to what kind of problem they have and what kind of treatment they are suggesting and what test they have conduction on the patient what was the result what medicine’s they have to give and later what is the condition of the patient. Everything in detail will be available with this application.

Due to this reason Hospitals are showing interest in this application.

Related Projects:

Medical Clinic Inventory System Project

This application can also be used in various departments of the hospital such as pathology, radiology, store inventory, HR, finance and Help Desk.

Now with the latest technologies Internet is used and also a picture of the patient is being taken with the support of the webcam.

This application records everything that every needs to be in the documentation for future use of the hospital and even for the patient. 

Java Project Report on Government Document Work Flow Management

Introduction to Government Document Work Flow Management Java Project:

It is the application developed using java scripts which also include HTML and JSP. It used the features of servlets and struts. It used My SQL for storing data or for data base management, to maintain the record of the government. It can be developed using eclipse and dream weaver. We can also add the bar code for the scanning purpose or security purpose.

There is always the problem of the government record or files where they are kept, it is very difficult task to maintain the file in the government record where they are kept. Customers always have to face the problem in government offices by spending hours but they get nothing. So to overcome this problem, an application is generated that can be used to maintain the record of the government offices. To make this better we use bar code that has the information of the particular department and the reason for the record.

Every customer will be given specific login id and password so that they can login from internet anywhere and anytime. This will reduce the headache of both customer and government. But this application they can be updated with the information.

This application includes the management process, proper documentation and information of the employee, bar code generation and scanner for any search. Documents are scanned by bar code before adding or retrieval and after that reporting of the statics data.

This application allows the user to setup their document and do the routing process if exceptions are generated. For every generation we have to generate the bar code for submitting the document and employee can also set their record in the data base for specifying in the department.

 Download  Java Project Report on Government Document Work Flow Management.

Increasing efficiency in Wireless Networks

 Abstract 

Supporting healthy and efficient operations in mobile wireless networks is the idea of the mobile ad-hoc networking. This is done by integrating the routing functionality into mobile nodes. The demand for wireless networks will be increased in future as their popularity and deployment are increasing more and more. Improving the speed of wireless networks is the main goal of this research. As a result, the demands of bandwidth which will be continuously raised can be met. Providing a framework to perform the required experiments in an environment which is platform independent is the primary goal. In order to meet this, the basic simulation of routers with Quality of Service should be designed and implemented in Java. 

Problem Statement

Drawing nodes in a particular network is the main objective of this project. The nodes can be added, deleted, the weight of the node can be changed, and the node can also be removed by making the node weight zero. The best path can also be identified for the designed network.

Existing System:

                        The design in the existing simulation packages is based on constructing a network model of routers and then the traffic is generated for every node. A number of routers should be simulated when there is an increase in number of nodes and also there will be an increase in the complexity of the simulation as the square of that number.

                            Thus, a system which provides a new approach for simulating the ad-hoc networks routers is required.                                                                                       

Proposed System:

                         The interest in wireless network infrastructures which support real-time communications has been increased with the emergence of roaming applications. A bandwidth routing protocol is proposed in this project for the support of Quality-of-Service (QOS) in a mobile network. In mobile networks, the QOS routing feature is significant for interconnecting wired networks (for instance, internet, ATM etc). Also, in an individual multichip mobile network, QOS routing protocol can work for real-time applications. Bandwidth allocation and end-to-end bandwidth calculation are included in the QOS routing protocol. By using such a routing protocol, the bandwidth is informed to the source and QOS will be available to the mobile network destination. The establishment of QOS connections in the mobile network and the real time application’s efficient support is allowed by this knowledge.

                         More efficient call admission control is also facilitated by it. In router interconnection cases, the bandwidth information is used for carrying out intelligent handoff in router gateways and for extending the service of router virtual circuit to mobile networks with probable cooperation of QOS parameters at the gateway. The system performance can be observed in several mobility environments and QOS traffic flows through simulation.

                        Different performance advantages of protocol which computes the bandwidth information are recommended by the results of simulation. In call admission protocol, it is mainly useful. The performance in the mobile environment is improved by “standby” routing. This improvement is shown by simulation experiments.                       

Module Information: 

Module-1

Routers Simulation                

Module-2

QOS implementation