AIM:The aim of Advanced rail way signaling process by excluding manpower using sensor project is to operate the railway gates depending on movement of rail and sensor’s operation.
DESCRIPTION: Here we are using two IR transmitters and two IR receivers for both the side sides of the train track which are placed on both the sides of the track at some distance from the station. When the train was come the fore side sensors will operate and when the train is leaving the other side sensors are operated. When the train was come then the stepper motor will rotate in on direction and after the train left the stepper motor s are operated in opposite direction. Depending on the direction of the train the sensors are operated. The main advantage is to avoid the rail accidents happening at un attended railway gates.
COMPONENTS:
- IR transmitter
- IR receiver
- AT89S52 controller
- ULN driver
- Stepper motor
- 555 timer
SKILL SET:
- Functionality of all above components
- Embedded C programming
- IR functionality
download Advanced rail way signaling process by excluding manpower using sensor project.
how to make it
which programing is used