Share Market System VB Project

The Share Market System project training in a student’s life is like a live experience in the industry. So it is very essential part of the educational qualification. Post Graduation Diploma in Computer Application is the course offering me a unique change to find the place of utilizing computer in meaningful way. It provides me all the theoretical aspects with practical knowledge.

Screen shots

The project training in the 2nd Semester of the course gives me the exposure to the real world. The aim of the project training, by understanding a live project, is to have practical experience of the real world. It also clears the picture of practical field to prompt the students to develop their qualities talents, etc. So that I can expand our view about the implications of the theoretical knowledge in the practical field. we had the opportunity for the same at various Home appliances firm. The period of the trainings would be around one and half month.

Operating System    :  Window XP Service Pack-2
Language    :  Visual Basic 6.0
Backhand Tools    :  Microsoft Access 2k

SOFTWARE DEVELOPMENT -:: LIFE CYCLE ::-

Feasibility Study:-

The main aim of the feasibility study is to determine whether developing the product is financial and technically feasible. The feasibility study involves analysis of the problem and collection of the data which would be input to the system, the processing required to be carried out on these data, the output data required to be produced by the system, as well as study of various constraints on the behaviour of the system.

Requirement analysis and Specification:-

The goal of the requirement analysis and specification phases to clearly understand the exact requirement of proprietor and to systematically organise these requirement into a specification document.

Requirement analysis involve obtaining a clear and through understanding of the developed, with view to removing all ambiguities and inconsistencies from the initial client perception of the problem.

reports

1.    Functional Requirements

The functional requirements of the system documented in the SRS document should Cleary described each function which the system would support along with the corresponding input and output data set.

2.    Non Functional Requirements

The non-functional requirements deal with the characteristics of the system that cannot be expressed as function.

It includes aspects concerning maintainability, portability and usability and also includes reliability issues, accuracy of results, human computer interface and constraints on the system implementation.

The Goal of Implementation :-

The goal of implementations a part of SRS documents gives some general suggestion regarding developments.

Design :

The goal of the design phase is to transform the requirement specification into a structure that is suitable for implementation. In some programming language. Through the design phase we can derive the software architecture from the SRS documents.

Coding and Unit Testing:

The purpose of these phase software development. During the implementation phase, each component of the design is implemented as a program module, and each of these program modules is unit tested, debugged and documented.

Integration and Testing: During this phase the different modules are integrated in a planned manner. The different modules making up a system are almost never integrated in a single shot.

Maintenance:-

Correct errors that were not discovered during the product development phase. This is called corrective maintenance.

Improving the implementation of the system and enhancing the functionalities of the system according to the Client’s requirement.

Porting the software to a new environment, e.g. to a new computer or a to new operating system.

Introduction:

It took us great to develop this software in Visual Basic as Front end and Access as Back end interface. This software is duly tested on different environment of hardware and software. The data security of this software is great as the data stored in various tables with unreadable characters.

This software provide various data such as Stock market Business, Stock information, the Balance details of the firm, Client personal Information, Script detail etc. It also provides data such as various Companies along with its Shares with specific code and type of the category.

36 Replies to “Share Market System VB Project”

  1. I’m from BCA 5th SEM
    I just need this project for my reference
    Would u plz send this full project
    It’ll be helpful

Leave a Reply

Your email address will not be published. Required fields are marked *