Hi, These are the latest projects for partial fulfillment of the requirements for a Master of Technology or Master of Engineering in Civil Engineering with a specialization in Infrastructure Engineering and Construction Management.
Infrastructure Engineering & Construction Management Projects
- The Integration of Drone Technology in Civil Engineering
- Highway Alignment Analysis Using Openroads Software
- Implementing Green Construction Technology in Construction Projects
- Investigating the Impact of Factors on Labor Productivity in Hilly Regions
- Assessing Delays in Construction Projects
- Planning and Timetabling a Significant Building Project
- The Effect of Waste Materials on Bituminous Mixture Characteristics
- Analyzing Challenges Experienced by Female Construction Workers During Covid-19
- Innovative Approaches in Air Transportation: The Concept of a Green Airport
- Advancements in Concrete Technology: High-Strength Concrete with Self-Healing Properties
- Adopting Sustainable Construction Methods for Existing Structures and Evaluating its Impact on Ratings
- Improving Highway Project Efficiency through Lean Construction
- Key Risks in Road Projects in India
- Enhancing Construction Management of Delayed Projects using BIM and Rescheduling with Primavera
- Predicting the Safety of Infrastructure Projects through MATLAB Neural Networks
- Identifying and Managing Risks in Building and Infrastructure Projects
- Managing Risks in Highway Projects
- Scheduling and Cost Analysis of Underground Works in Hydroelectric Projects
- Timetabling Repetitive Non-Serial Activities of Multi-Storey Parking and Cost Estimation
- Modeling an Intersection Using PTV VISSIM
- Examining the Factors that Influence Highway Widening Projects in Hilly Areas
- Analyzing Labor Productivity in Construction Projects in India
- Improving Labor Productivity in Hilly Terrain in Construction Projects
- Investigating the Strength and Durability of Recycled Aggregate Concrete
- Evaluating the Success and Failure of Hydropower Projects
- Time and Cost Contingency Assessment and Analysis
- Optimizing Time Delay and Cost Overrun Analysis in Construction Projects using Genetic Algorithms
- Analysing Time Delays in Road Construction Projects
- Utilizing Waste Material in Cool Pavement Construction
- Identifying the Most Significant Delaying Factors in Hilly Road Construction
- The Use of Waste Material in Concrete for Rigid Pavement Construction
- Understanding the Factors that Affect the Compressive Strength of Geopolymer Concrete
- Time Contingency Analysis for Construction Projects
- Comparing Accidents on Dam and Highway Construction Sites
- Examining the Feasibility of the Public-Private Partnership Model for Dam Construction
- Computing the Height of Lift and Placement Frequency in Concrete Dam using FEA
- Designing and Scheduling a Significant Building Project
- Developing a Whole Life Cost Model for Road Tunnels
- Comparing the Life Cycle Costs of Normal and Green Buildings
- Investigating the Mechanical Properties of Porous Lightweight Concrete
- Mix Design and Factors Affecting the Strength of Pervious Concrete
- Timetabling Repetitive Non-Serial Activities of Multi-Storey Parking and Cost Estimation
- Designing Shimla as a Smart City through Smart Solutions
- Investigating the Factors Influencing Highway Widening Projects in Hilly Areas.
- Challenges in Preserving Historical Structures: Material Considerations
- Minimizing Construction Waste through Lean Integrated Project Delivery: A Development of Interpretive Structural Model
- Real-Time Monitoring of Ready Mixed Concrete Delivery with an Integrated Navigation System
- Reducing the Delivery Time of Ready Mixed Concrete Through Particles Swarm Optimization (PSO)
- Textile Wastewater Treatment by Zero-Valent Aluminium Based Advanced Oxidation Processes and Fe/Al catalyzed Advanced Oxidation Processes
- Development of Interpretive Structural Model for Challenges in Precast Construction for Indian Infrastructure Project
- Assessment o the Physical Space Utilization and Land Use for Healthcare Facilities
- Evaluating Capacity and Delay for Signalized Arterials with Freight Deliveries
- Application of Failure Mode and Effect Analysis (FMEA) as Risk Management Tool
- Impact of Roof Garden on Annual Building Cooling Load
- Social Benefit-Cost Ratio Analysis (SBCA) and Life Cycle Cost (LCC) Analysis for Sustainable Transportation Project
- Mode Choice Behavior in Urban Travel
- Application of 6D BIM in Designing of Energy Efficient Building
- Assessment of Educational Infrastructure Requirement for Ahmadabad Region
- Development of Geotechnical Site Characterization Model for Ahmedabad City
- Performance Analysis and Comparison of Fixed Time Traffic Control System and Adaptive Traffic Control System
- Lcc for Affordable Housing Using Supplementary Chementitious Materials
- Life Cycle Costing Analysis of Municipal Solid Waste to Energy Techniques
- Analysing the Impact of Building Orientation and Lighting Sensors on Annual Lighting Load
- Application of Genetic Algorithm for Scheduling Transit Mixer Delivery of Ready Mixed Concrete (RMC)
- Application of Genetic Algorithm for Resource Optimization of Precast Construction
- Comparison Between Suitability of Flexible Pavement and Rigid Pavement
- Development of Output and Performance Based Road Contract (OPRC) Model for Maintenance and Management of Roads
- Development of Red Light Violation Detection System for Heterogeneous Traffic.
Contact Us for more details about these Construction Management Projects