Development of Remote Waste Gas Monitor System

Development of Remote Waste Gas Monitor System project uses two wireless technologies GSM, GPS. As GPS wireless technology will be used to find the location and GSM wireless communication will be used to send the message to the control.

Atmospheric pollution is getting increasing day by day. And air pollution is one which is causing lot many health diseases. And motor vehicles and factories are two major factors which are polluting the air. As industries are getting increasing the pollution also increasing and lot many industries are releasing the waste gases into the air and causing the health diseases to the people.

LPC2148 micro controller is used in this project which is one of the widely used micro controller. which the current dominant microcontroller in mobile based products and software development Tool as Keil(IDE) and flash magic for loading hex file in to the microcontroller.

download  Development of Remote Waste Gas Monitor embedded System project.

Design and Development of Mobile Phone for Blind/Old People

Design and development of Mobile phone for blind/old people Project Abstract

Now a days as the technology is getting updating day by day which is making the educated people to easily operate the mobile phone. But it becomes somewhat critical for blind/old people to operate the mobile phones for calling to specific person. This project “Design and development of Mobile phone for blind/old people” will provide an easy method for the blind people to call to specific person. In this method we are having small keypad for selecting the switch to call to a specific person. MIC and speakers provides for speaking and listening facility.  The main advantage of this project compared to the normal telephones or mobiles phones as we are interfacing with microcontroller it is possible to monitor and control the devices also.

Design-and-development-of-Mobile-phone-for-blindold-people

Design and development of Mobile phone for blind/old people program will be written in the Embedded C language. Using the Keil IDE and loading of the hex file will be done by using the flash magic. 

Design and Development of Highly Secured Conference Hall in Confidential Meetings Using Graphical LCD

Design and development of Highly secured conference Hall Project.

As using of mobile phones in the conference halls, meetings are restricted some times. So providing the security in such areas like finding of the mobile phone usage and detecting the fire using of fire alarm will be more useful.  So this project “Design and development of highly secured conference Hall in confidential meetings by using graphical LCD” will give low cost implementation with more security. And this project will also uses the graphical LCD display which is more advantage than the normal 2×16 character LCD. By using this Graphical LCD we can also display the images. This kind of Graphical LCD will be useful in the GPS receivers, mobile phones etc.

SOFTWARE: Embedded ‘C’ language.

TOOLS: Keil, Flash magic

TARGET DEVICE: 8051/ARM7 microcontroller

APPLICATIONS:  Examination halls

ADVANTAGES:  Automatic Detecting of the using of Mobile phone. 

Interactive Correction and Recommendation for Computer Language Learning and Training

Interactive Correction and Recommendation for Computer Language Learning and Training has the below classification modules:

           1. Authentication module

        2. Theoretical study module

        3. Practical implementation module

        4. Visual study module

       5. Recommendation module

1. Authentication module:-

In this module we need to check the authentication weather the concern person is authorized or not. For that purpose we put user id & password to check the validity. We put the authentication related data on to the database when user want to log in it check with database if matching takes place then only the concern person will use the functionality.

2. Theoretical study module

In this module, user needs to study the text document. For that purpose user must be an authenticated one. We have no of documents based on sqlserver. User need to study required documents for implements the ideas as well as to generate some knowledge regarding the database software.

3. Practical implementation module

In this module use need to implement the ideas generated by reading the theory. For that purpose we need the concern software in general. Here itself we programmatically call the concern software so that user can practice & implement the theory.

4. Visual study module

In this module user can visualize some video as well as user can hear some audio file so that he can get some more knowledge regarding sql server.

5. Recommendation module

Here itself some artificial intelligence will added so at the time of practice if some error occur some recommendation comes into picture ,how to rectify that particular mistake.

Hardware Specification:

Processor                  :  PENTIUM IV

Ram  Size                      : 1 GB

Hard disk drive         : 40GB

Software Specification:

Front End                            :  vb.net

OS            :  Windows Vista

Server                              : Sql Server 2005

Final Year Project on Account Tracking System

Abstract:

      The Account Tracking  System validates the user details and checks for the access permissions. The access to the various modules of the System is provided based on the privileges of the users.

Scope:     

       The following is the scope of this project. The following modules will be developed as part of the final product to be delivered to the organization. The detailed scope for the below mentioned modules will be provided in software requirements specification document.

            Basically this project consists of four modules.

 1.      Project Tracking.

2.      Resource Tracking.

3.      Personal Tracking.

4.      Task Tracking. 

Introduction To Account Tracking  System:

The Project Information consists of all the information about the particular project that includes Project name, duration, cost, start date, end date etc.,.The operations are performed in the similar way  as the User information operation does. Here projected is the primary key.

Project-Resource will have ability to enter tasks related to the project. Tasks include task name, duration, start date and end date .Privileges on the tasks create, update and delete for the current week. 

New Project

Task Creation will be consisting of the task name, resource-id, create date, end date, project id and task description. For a  particular Resource-id and its associated Project-id  a task name ,task id ,creation date, end date and its description will be entered in the Resource Task Creation form to create a new task. Which will be entered in the task table. In this Task Creation we are not considering the Status field, because the Resource (him/herself) is creating a new task after completion of the Task assigned by the PM-TL. 

View/Modify Project

In the Resource Task Updating the Project-Resource will be updating the tasks in the update task form by  hyper linking the loginid. which will be directed to the Updating form that doesn’t contain the Task id Depending up on the taskid  the updating will be done to the remaining fields which are in the form. After submitting the form, the updating will be reflected in the task table. 

Resource Tracking

In the Resource Task Updating the Project-Resource will be updating the tasks in the update task form by hyper linking the loginid. Which will be directed to the Updating form that doesn’t contain the Task id depending up on the taskid the updating will be done to the remaining fields which are in the form. After submitting the form, the updating will be reflected in the task table.

In the Resource change password operation only the resource that entered can change the old password with a new password to provide more security for the information .The user is provided with a confirmation password field to confirm the new password field. If the password field is not confirmed by the user then the password will not be changed a warning will be displayed If the password field is confirmed the user can login with the new password.

Resource Task Creation will be consisting of the task name, resource-id, create date, end date, project id and task description. For a  particular Resource-id and its associated Project-id  a task name ,task id ,creation date, end date and its description will be entered in the Resource Task Creation form to create a new task. Which will be entered in the task table. In this Task Creation we are not considering the Status field, because the Resource (him/herself) is creating a new task after completion of the Task assigned by the PM-TL. 

Time  Tracking  

 The Task Information consists of the tasks assigned to the user and  it consists of all the information about the user and the project. The Assigning task consists the  project information and resource information .After selecting the particular project  it displays the associated resources  of that project then we select one of the resource  and assign the task to that resource after giving the task description . 

Personal Tracking

            This subsystem enables the project resource to enter the task of the project. The entire project task includes the task name, task duration, task start date, task end date.

Java Project on Resource Planner

Java Project On Resource Planner software aids the company management not to waste the resources and plan the projects and employees time to time.

When a software development company wants to achieve its goals on time and efficiently use its staff on the projects, it is necessary for the company to have hands on information related to number of employees working on various projects along with their skill set and the number of employees still needed to complete the projects on time. Resource Planner is a convenient tool to handle various projects in a software company efficiently.Resource Planner is an online tool to manage projects currently running with the company as well as future projects.

This is an online tool so more than one user can login into system and use the tool simultaneously. The administrator of this software will be able to create new users and remove any user. He allots passwords and changes them. He can view the details of all employees in the company. 

HR manager should take a decision regarding whether to recruit any employees and whether there is dearth of any resources in a project. The project manager can view the details of the employees in the company and the employees in his projects. He can also get the information of how many employees are there in a particular project and their skill set. When he wants employees for a particular project, he can add that information mentioning how many are working on the project and how many employees are totally needed for the project. This information can be had both for online and offline projects. This information is used in generating a special report called GAP summary.

Conclusion:

The entire project has been developed and deployed as per the requirements stated by the user, it is found to be bug free as per the testing standards that are implemented.  It helps HR people and Project managers of the organization and provides effective communication between them to utilize the resources very promptly with proper planning.The system at present does not take care off collecting the resources as resource which was already implemented earlier. This system was integrated with resourcepool in the production environment to actually get the real info about the resources.

download  Java Project On Resource Planner Project Report.

Java Project on Project Management Information System

Project Management Information System (PMIS) deals with the various levels of project development and will account for time used in analysis, design, programming, testing and verification etc.

Description:

Project Management Information System (PMIS) gives the management a clear picture of usage of time by projects i.e. utilized time and unutilized time. By analyzing the results provided by the software they might rectify the defects in utilizing time and take remedial actions.

Project Management Information System (PMIS) takes time sheet reports as input. The input may be in non-standard format  differing from project to project.

Project Management Information System gives the individual report of project, which contains time used for various tasks, and also gives the picture of the unutilized time based on the project Information project manager will assign activities to employees who are working under him.

OBJECTIVES:

When using this system to manage a project, you need to perform the following activities:

  • Establish a project starting and ending date
  • Enter activities and assign activity relationships
  • Select a scheduling method to review project.

Present System:

            In the present system all the information in maintained in the manual records to maintain details of the organization, and this becoming difficult to maintain details of all the projects, employees working in different projects and its reports at the same time this manual process is always time taking. So in order to reduce all the drawbacks of the manual system we are for newly automated system.

Proposed System: 

The newly constructed system will maintain all the above details at one place and depends upon the login constraints we are using it allows us to access the details of different phases of the system and all this system is constructed with different modules.

Project Management Information System takes time sheet as input. The input may be in non-standard format differing from project to project.

Project Management Information System produces output in the form of reports. This output gives a clear picture of the time used at various levels of the project.

In Project Management Information System new project information is entered by the technical manager, based on the project information project manager will assign activities to employees who are working under him.

download  Project Management Information System Project.

Robust Spanning Tree Topology for Data Collection and Dissemination in Distributed Environment

Robust Spanning Tree Topology for Data Collection and Dissemination in Distributed Environment Project Document contains:
  1. Introduction of the project
  2. Project Literature Survey
  3. Analysis Phase and Design Phase
  4. Implementation & coding of the project
  5. Testing phase  and Debugging phase
  6. Conclusion of the project

Software requirements:

Operating System Used: Windows 2000 / XP, Linux Fedora Core 4.

Programming Languages/Software Used: Java Run time Environment, Java Development Kit 1.6.0

Robust Spanning Tree Topology for Data Collection and Dissemination in Distributed EnvironmentHardware requirements:

Architecture: Pentium-4 PC

Hard Disk: 20 GB hard-disk

RAM SIZE: 256 MB RAM

Equipment: Keyboard, Mouse Not-Applicable

Download Robust Spanning Tree Topology for Data Collection and Dissemination in Distributed Environment Project

Enterprise Resource Planning Management

Enterprise Resource Planning Management Projects main idea is to develop a application which can help organizations to manage administration data with employ recruitment and personal information of employees.

PROPOSED SYSTEM

Keeping in view of growth that has been envisaged, it may not be practical and economical to continue with the current system. To facilitate a more efficient Recruitment System and to increase the responsiveness, it is necessary to have better Recruitment System integrated with the enterprises Information System.

System Objectives:    

 To  automate selection process. To  facilitate high graphical user interface to the user. To provide better functioning and accurate information in time. To provide data maintenance features.  To improve the efficiency and to reduce the overload of work.

EXISTING SYSTEM 

No proper dynamic search method is available to immediately access a particular record. Fast retrieval of required data is not possible thus causing delay and unnecessary search of the entire list.

FoxPro under Novel NetWare version is not a graphical user interface based application. User interaction with the system is minimized because of the DOS environment, unlike the windows environment where the user interaction with the system is high.

Handling of large databases effectively is not possible with the above software.

Conclusion:

The efficiency of any system designed to suit an organization depends cooperation during the implementation stage and also flexibility of the system to adopt itself to the organization. ERPM  is well suited  when organization  want to recruit people in their organization.

download  Enterprise Resource Planning Management Project.

Enhanced Greedy Routing with Anti-Void Traversal for Wireless Sensor Networks

SOFTWARE AND HARDWARE REQUIREMENTS

 Once the destination file and the destination is selected now its time to select the file which is to be transmitted.

  1. Once the open button is clicked, a file dialog box is displayed to select the file which is to be transmitted.
  2. Now the selected file is displayed.
  3. Finally the “TRANSFER” button is clicked.
  4. We can view the path i.e., through which nodes the data is being transmitted.
  5. We can notice that there is no packet loss in the entire data transmission.

EXPLANATION

  1. Here we can view the simulation of how the nodes are routed in a network.
  2. The sender have to select the destination node in order to transfer the data.
  3. In this simulation the error node (the node where the void problem occurs) is also selected.

Here we can view the Packet Arrival Rate, Average delay and Path efficiency

Enhanced Greedy Routing with Anti-Void Traversal for Wireless Sensor Networks Software Requirements:

Operating System       : Windows XP/Vista.

Front End                    : Asp .Net 2.0.

Programming Language       : Visual C# .Net

Hardware Requirements:

System Architecture        : Pentium P IV

Hard Disk Size                    : 80 GB.

Ram Size                               : 512 MB.

Download Enhanced Greedy Routing with Anti-Void Traversal for Wireless Sensor Networks Project