Educational Loan Processing System Mainframe Project

Environment:   IBM MAINFRAMES-MVS OS/390; WINDOWS NT, EASYTRIVE, DB2 DATABASE

Tools:  CHANGEMAN, INFOMAN, FILE AID, ISPF, VSAM, TSO, NDM, SEQUNTIAL FILES

Project Title: Educational Loan Processing System Mainframe Project

Educational Loan Processing System Mainframe Project provides loans for educational purpose. The ELPS IT systems have various applications which will serve end to end loan process. The various loan process applications include Diploma, Appworks, CLASS, BI, and web based applications. Diploma is a highly customized version of the advanced customer lending system (ACLS) developed by American management systems, which provides loan accounting and maintance capabilities. This Is an IBM mainframe-based system that allows for the following operations.

  • Online real-time updates
  • Batch processing

RESPONSIBILITIES:

  • Required to coordinate all the team activities like, checking the work assignments to the team members, scheduling meeting with the onsite and offshore team members.
  • Working out to meet all the access requirements of the team members at different locations to be done in time without deviating from the schedules.
  • Interacting with the onsite team/ clients.
  • Checking and studying the feasibility of the given user requirement.
  • Impact analysis within and outside the system.
  • Distributing the objects to the team members, depending on the expertise levels of each employee and Making sure that, all the objects are done with the best efforts and with the best results.
  • Creating the design documents (high/low) and getting it approved from the client.
  • Development of the objects, following all the coding standards.
  • Involved in Regression testing, unit testing, integration testing, and system testing of the developed objects.
  • Delivering the source code to the production box.
  • Supporting the implementation of software in to production environment.
  • Monitoring the performance of the existing system and enhanced systems and also taking actions for improvement in performance will be taken.
  • Identifying the root cause for all the production problems and post implementation problems.
  • Taking care of quality assurance activities for all deliverables as per iqms procedure of TCS, So that developed software meets the standards & guidelines as well as meets the requirements Specified by users. 

Leave a Reply

Your email address will not be published. Required fields are marked *