• Mini Project: Automatic Railway Signaling Systems
  • Duration: 2 Months
  • Platform: Embedded Systems

Project Description: The objective of this Automatic Railway Signaling Systems project is to automate RAILWAY SIGNALLING SYSTEM to avoid accidents occurring at the railway Gates due to manual control using Embedded Systems. By this System gate keeper is not required.

Download Automatic Railway Signaling Systems.